Phase 3:
Construction Services
IRCC can
provide ongoing technical and administrative support through the
project with the following services:
1) Review Of Design Team Drawings & Documents:
Review design
team documents, cross sections, and specifications to highlight any
criteria which could be problematic for the long term reliable
operation of an ice rink. Emphasis of review would focus
on following areas typical of mistakes in arena applications:
-
Suitable
material selections and applications
-
Proper
vapor barrier placement in walls, ceilings, and under slabs in
rink area
-
Design of
building ventilation and environmental control systems
-
Wall
terminations methods with pre-engineered metal building
-
Wall
finishes and painting materials for steel and masonry
-
Door
coverings & hardware
-
Light
fixture design, selection, elevations and placement
-
Counter
designs
-
Computer
terminal locations
-
Insulation
and Low-E ceiling designs
-
Door
thresholds and rubber flooring placement coordination
-
Concrete
slab hardeners
-
Storage
provisions
-
Ice
resurfacer room layout and support
-
Fire
protection design
-
Snow
melting pit design
-
Water
fixture types, size, locations
-
Scope
documents for responsibility and coordination
2) Assist With Contractor Coordination & Negotiations:
-
Help
contractors by identifying key vendors or subcontractors proven
to provide the best prices for the specialized components
required for the application.
-
Assist
contractors with an intimate understanding of the work through
videos, photographs, and like documentation to eliminate the
atmosphere of risk and the extra discrepancy dollars charged for
such unknown construction risks.
-
Provide
access to like general contractors whom have built similar
complexes for discussions leading to a better awareness of the
work.
-
Helping
contractors understand the best processes to coordinate with the
rink contractor and various trades along with the identification
of the typical high risk portions of the project which normally
would cost a contractor extra monies. Provide on-site rink
consultant during key phases of construction.
-
In matters
of design build contract negotiations, work with the contractor
with creative solutions to provide the lowest cost while
maintaining performance and quality standards for the owner.
3) Provide A Narrative Description And Performance
Specifications For The Following Areas:
-
Sub-soil
heating system
-
Fine
grading process
-
Rink floor
insulation and vapor barriers
-
Concrete
rink floor rink reinforcing steel and concrete specification if
applicable
-
Rink piping
system design
-
Concrete
placement, finishing, and curing process and tolerances
-
Testing
procedures
-
Dasherboard
and upper shielding specification
-
Snow
melting pit design
-
Heat
reclaim systems if applicable
-
Dehumidification systems
-
Ice rink
specialty equipment specifications
-
Comparison
of ice resurfacer brands and fuels
4) Provide Detailed, Project Specific, Ice Rink System Drawings
& Specifications:
IRCC will
provide detailed manufacturing and construction drawings for all ice
rink related machinery components, and adjoining systems for the
successful bidding and coordination of the ice rink system with the
general construction trades. These drawings include but may not be
limited to the following:
Drawing
Description
00000-03-00
FLOOR PLANS
00000-03-00 DEMOLITION PLANS (If Applicable)
00000-04-00 MECHANICAL ROOM LAYOUTS
00000-04-00 MECHANICAL ROOM ELECTRICAL LAYOUTS
00000-05-00 STEEL TUBE DASHERBOARD LAYOUTS
00000-05-00 ALUMINUM DASHERBOARD LAYOUTS
00000-05-00 INLINE HOCKEY DASHERBOARD LAYOUTS
00000-05-00 INLINE HOCKEY DASHERBOARD ASSEMBLY SHEETS
00000-07-00 ST'D
ELECTRICAL - POWER DIAGRAMS
00000-07-00 ST'D
ELECTRICAL - CONTROL DIAGRAM
00000-07-00 MICRO ELECTRICAL - POWER DIAGRAM
00000-07-00 MICRO ELECTRICAL - CONTROL DIAGRAM
00000-07-00 MICRO ELECTRICAL - 3 LINE DIAGRAM
00000-08-00 GENERAL PIPING SCHEMATICS
00000-08-00 PRIMARY ISOMETRIC
00000-08-00 SECONDARY ISOMETRIC
00000-08-00 SUBSOIL HEAT ISOMETRIC
00000-08-00
SUBSOIL & HEAT RECLAIM ISOMETRIC
00000-08-00 CONDENSER WATER ISOMETRIC
00000-08-00 SNOW MELTING PIT ISOMETRIC
00000-09-00 SECONDARY TRANSMISSION LINES
00000-09-00 SUBSOIL HEAT TRANSMISSION LINES
00000-10-00 PERMANENT SAND BASE RINK HEADER
00000-10-00 PERMANENT SAND BASE RINK PIPING LAYOUT
00000-10-00 CONCRETE RINK PIPING HEADER
00000-10-00 PORTABLE PIPING HEADER
00000-10-00 PORTABLE PIPING MAT LAYOUT
00000-11-00 PORTABLE PIPING SUBHEADERS
00000-12-00 STEEL TUBE DASHER T-GLASS APPROVAL
00000-12-00 STEEL TUBE DASHER T-GLASS SCHEDULE
00000-12-00 ALUMINUM DASHER T-GLASS APPROVAL
00000-12-00 ALUMINUM DASHER T-GLASS SCHEDULE
00000-12-00 STEEL TUBE DASHER ACRYLIC APPROVAL
00000-12-00 STEEL TUBE DASHER ACRYLIC SCHEDULE
00000-12-00 ALUMINUM DASHER ACRYLIC APPROVAL
00000-12-00 ALUMINUM DASHER ACRYLIC SCHEDULE
00000-12-00 STEEL TUBE DASHER FENCING APPROVAL
00000-12-00 STEEL TUBE DASHER FENCING SCHEDULE
00000-12-00 ALUMINUM DASHER FENCING APPROVAL
00000-12-00 ALUMINUM DASHER FENCING SCHEDULE
00000-13-00 SUBSOIL HEAT HEADER
00000-13-00 SUBSOIL HEAT PIPING LAYOUT
00000-14-00 STEEL TUBE DASHER SUPPORT SCHEDULE
00000-14-00 ALUMINUM DASHER SUPPORT SCHEDULE
00000-15-00 CROSS SECTIONS
00000-16-00 PERMANENT SAND BASE RINK PIPE FLOOR ISOMETRIC
00000-16-00 CONCRETE FLOOR RINK PIPING ISOMETRIC
00000-18-00 CONCRETE
PLAYER BOX DETAILS
00000-18-00 STEEL PLAYER BOX DETAILS
00000-18-00 WOODEN PLAYER BOX DETAILS
00000-19-00 SNOW PIT DETAILS
00000-20-00 DEHUMIDIFIER DETAILS
5) Review Contractor Bids
IRCC will
review contractor bids as required to determine compliance with
specifications and to evaluate performance standards.
6) Review Contractor Submittals As Required
IRCC will
review and approve submittals which apply to the ice rink equipment
or for items which are specialized to the ice rink industry.
7) Provide Site Inspections At Key Milestone Dates Of
Constructions ( 3 Standard )
IRCC will
partake in three (3) site meetings and/or three (3) site inspection
procedures to coordinate the work performance and/or to visually
verify that work performed is complying with industry standards.
This section specifically applies to site construction activities
covered under this phase of work and does not limit IRCC from other
meetings required to execute other phases of work covered under its
consulting proposal. Additional site visits can be made on a per
diem basis during the construction phase if desired by the owner or
primary design team.
If you are interested in receiving these construction services,
please contact IRCC for written proposal.
|